Primary testing in electrical substations to validate the overall functioning of the system under operating conditions. These tests include the verification of equipment such as current transformers (CT), voltage transformers (VT), circuit breakers, disconnectors, power transformers, surge arresters, transmission lines, grounding systems, among others. All of this is carried out in accordance with established procedures to ensure the operability and reliability of the electrical system in the substation.